Monthly Archives: November 2012

Potable Water Treatment Plant resource info, references, notes

Programming notes, Sequence of Operations: Valve V1 (Diverts incoming flow from stream intake either to WTP or to bypass, depending on water level in storage tank.) Install vertical float switch FS-1 in water storage tank, near top.  Set difference in … Continue reading

Posted in water systems | Tagged , , | 1 Comment

SGEV Energy System, Micro-grid

Site info: Total property is 94 hectares (234 acres).  It is saddle shaped, with river & valley running West to East across the middle, rising to ridges at north and south. Highest elevation at South ridge is 980 M. River … Continue reading

Posted in hydro, Master Energy Plan, micro hydro, solar pv | Tagged , , , , , | Leave a comment